How the region moves

The Metro & the Ferry

One of them is Britain's oldest form of public transport still running; the other was Britain's first modern light rail network outside London. Together, they're how Tyne and Wear actually gets about.

The Tyne and Wear Metro

Conceived in 1971 and built through the 1970s largely along Victorian railway alignments — some dating back to the Newcastle & North Shields Railway of 1839 — the Tyne and Wear Metro opened in stages from August 1980, becoming the first comprehensive light rail system built anywhere in the UK outside London. New tunnels were bored under central Newcastle and Gateshead, and a dedicated new bridge, the Queen Elizabeth II Bridge, was built to carry it across the Tyne.

The original network was completed in 1984. A short extension reached Newcastle Airport in 1991, and in 2002 a much larger one, sharing tracks with National Rail services, extended the network south to Sunderland and South Hylton — finally putting Wearside directly on the Metro map.

Two lines, one shared spine

Today the network runs two lines — Green (Airport to South Hylton) and Yellow (St James to South Shields via the North Tyneside coast) — over 60 stations and around 78km of track, sharing their busiest section through the centre of Newcastle and Gateshead. The Yellow line's coastal loop is unusual enough to have its own nickname among transport planners: a "pretzel" route, where the line crosses over itself and trains call at Monument twice, on different platforms, within the same journey.

Passenger numbers peaked at 59 million a year in the mid-1980s and have settled since at somewhere around 35–40 million annual journeys. The system's black-on-yellow "M" logo and Calvert typeface — designed by Margaret Calvert, best known for Britain's road signs — have barely changed since 1980, and the original 1980s Metrocars are only now being retired, replaced by new Class 555 trains that entered service from December 2024 as part of a £103m modernisation programme.

Still growing

The next extension is already on the drawing board: a proposal to reuse part of the old Leamside rail line would finally bring the Metro to Washington, connecting Pelaw and South Hylton via a town that has never had its own station.

The map below is a simplified diagram, in the tradition of most metro maps — it shows the shape and order of the network rather than exact real-world geography.

Metro quick facts

Operator
Nexus
Opened
1980
Lines
Green & Yellow
Stations
60
Track length
~78km
Sunderland link
Added 2002

Simplified network diagram

The Metro map

Airport Kingston Park Regent Centre Haymarket Sunderland South Hylton St James Longbenton Whitley Bay Tynemouth Wallsend Byker South Shields Jarrow Monument Gateshead Green line — Airport ↔ South Hylton Yellow line — St James ↔ South Shields (via the coast)

The Shields Ferry

Long before the Metro, before the railways, even before Newcastle's first stone bridge fell down, boats were crossing the Tyne between North Shields and South Shields. Records point to a ferry operating here since at least the 14th century — small rowing boats known locally as "comfortables" — making the Shields Ferry one of the oldest continuously operating transport services anywhere in Britain.

By 1929 there were eleven separate ferry crossings dotted along the Tyne, from Newburn down to the river mouth. The Shields crossing was formalised in 1827 under an Act of Parliament, with steam-powered "penny ferries" from the 1830s and a cheaper rival, nicknamed the "Ha'penny Dodger," competing for passengers from 1847. The opening of the Tyne Tunnel in 1967 made most of these crossings redundant almost overnight — except this one.

The last ferry on the Tyne

Taken over by the region's Passenger Transport Executive (now Nexus) in 1972, the Shields Ferry is today the sole survivor of a river once criss-crossed by small boats. Two vessels, the Pride of the Tyne (1993) and Spirit of the Tyne (2007), share a half-hourly timetable, crossing in around seven minutes. Its single busiest day of the year, fittingly, is the Great North Run, when thousands of runners and spectators use it to cross a river the race itself runs alongside.

Ferry quick facts

Operator
Nexus
Running since
c. 1377
Crossing time
~7 minutes
Frequency
Every 30 min
Vessels
2

The crossing today

Where the ferry runs

North Shields ↔ South Shields, roughly 7 minutes each way Map data © OpenStreetMap contributors

Keep exploring

See the places these connect